- Design Qualification (DQ)
- Installation Qualification (IQ)
- Operational Qualification (OQ)
- Performance Qualification (PQ)
- More user-friendly packaging option in comparison of bottled capsules and tablets
- A cost-effective packaging option
- A secure packaging method for the protection of pharmaceuticals
- Easy to consume a single capsule or tablet without touching other tablets
- Easy and smooth operation
- High strength and efficient performance
- Easy maintenance and long service life
- Ideal for heat sealable foils
- Easy process monitoring
- Aluminium foil
- Cellophane
- Polyethylene
- Paper
- Plastic
- Other heat-sealable materials
DESCRIPTION |
SPECIFICATIONS |
Equipment |
Satellite
Engineers Strip Packing Machine. |
Specification |
Model SE-210 |
Capacity
|
Maximum
Sealing Width 210mm 6
Track – 900 to 2100 8
Track – 1200 to 2800 (Output
depends on Shape and Size of Tablet.) |
Model |
The
equipment should be a GMP model. |
Overall
dimensions |
L
2080mm x W 1140mm x H 1900mm |
Weight |
Machine:
750 Kg. |
Process
|
Feeding System: Product is fed into the hopper from where it is guided
into the Bowl mounted on a Vibrator. The
product on the Bowl is evenly distributed and guided through the tracks on
the Bowl into the Chute Channel and the feed rate of the Product from the
Bowl to the Chute Channel is controlled by the Vibrator. The Product from the
Chute is released onto the Sealing Roller by the Cam Operated Release Pin.
Sealing System: The set of Sealing Rollers draws the heat-sealing
Packing Material (Foils) from 2 sets of front adjustable type of friction
brake system Foil Holder Assembly and Foil running tubes. The sealing Rollers are heated to the required
temperature by the Cartridge Heaters inserted into the individual
Rollers. Adequate pressure is applied onto
the Sealing Rollers so that both the foils get sealed at the time of contact while
passing through the sealing roller. At this stage the product which is released
onto the cavity of the rollers gets packed and sealed in the foils. |
TEST No. |
CRITICAL FEATURE |
1 |
Documents & Drawings Verification. |
2 |
Verification of Technical Specification for In-House
& sub-components/bought out items. |
3 |
Utilities Verification. |
4 |
Material of construction
verification. |
TEST
No. |
CRITICAL
FEATURE |
1 |
Control Panel Testing |
2 |
Safety Feature Verification |
3 |
Batch Coding Verification |
4 |
Travel of the product from the
bowl to the chute and dropping into the pocket (Feeding of Product
Verification) |
5 |
Sealing of the foil when the foil
passes through the sealing Rollers.
(Sealing of Strip Verification) |
6 |
Slitting & Cutting the Strip
Verification. |
7 |
VFD function Verification. |
The
table below lists the tests to be performed as part of the Performance Qualification
phase.
TEST
No. |
CRITICAL
FEATURE |
1 |
Machine
Speed |
2 |
Vibrator
Speed |
3 |
Sealing
Temperature |