SOP for Preventive Maintenance for Induction Cap Sealer Machine

OBJECTIVE
To ensure operational qualification and performance qualification are achieved.
To reduce down time and running coast.

SCOPE
This SOP provides the guide for maintenance for optimum output of the sealer.

RESPONSIBILTY
It is responsibility of operator to follow the procedure as per the SOP.
It is the responsibility of the maintenance supervisor/packing supervisor to ensure that the procedures are followed.

PROCEDURE
  • Always performs periodic visual inspection. There should not be any Burning scent from within the enclosure.
  • Check for dust built up (especially in dust environment) inside the top cabinet.
  • Use an air horse set at low pressure just enough to move the dust, from equipment.
  • NOTE: Air must be clean and dry
  • Before attempting any repairs wait at least 10minutes after switching off machine.

SAFETY
CATION: DO NOT WEAR ANY JEWELRY SUCH AS WATCHES, RINGS OR BRACELETS WHILE WORKING NEAR THE SEALING HEAD.

REVISION HISTORY
Nil