OBJECTIVE
To lay down a procedure for the operation of Distilled water still.
SCOPE
This procedure applies to the pharmaceutical manufacturing facilities of PharmaSky Limited.
RESPONSIBILITY
The Quality Control Chemist is responsible for the implementation of the process.
The Quality Control Manager is responsible for the execution of the procedure.
PROCEDURE
- Open the inlet water tap and let water flow into the still until it starts flowing out of the still.
- Switch on both the heating elements and wait until distilled water starts coming out from the bottom of the condenser.
- Adjust the supply in such a way that the lower 1/3 portion of the condenser jacket is not uncomfortably hot.
- Collect the required amount of water.
PEOPLE ALSO READ: SOP for Testing Procedure of Water for Manufacturing Use
- Switch off the heaters and let cold water run for another 10 minutes before finally closing the inlet tap.
- Note: Ensure that the water supply to the still is closed when the still is switched off.
REFERENCE(s)
Nil.
ABBREVIATION(s)
SOP : Standard Operating Procedure
Q.A : Quality Assurance
No. : Number
Q.C : Quality control
ANNEXURE(s)
Annexure No. – 1 - Distilled water still operation log
REVISION HISTORY
Nil
PEOPLE ALSO READ: SOP for Operation of Emergency Eyewash Safety Shower
0 Comments