Purpose:
To provide a documented procedure for Procedure For Restart The Activities After Power Failure / Breakdown
Objective:
Procedure For Restart The Activities After Power Failure / Breakdown
Responsibility:
- Primary: Technician Engineering
- Secondary: Manager Engineering
Procedure:
Power failure:
- Check the main power circuit panel for voltage and break down.
- Start the D.G. Set and check the voltage and frequency, it should be 430 V and 50 HZ
- Then changeover the power supply from main power supply to D.G. Set for normal operation.
- After resuming the power supply from main power supply check the voltage and frequency.
- Before changing over power supply from D.G. Set power supply inform the critical Processing areas personnel and switch the power supply for normal working.
Breakdown:
- In case of breakdown of power supply, confirm the nature of breakdown.
- Start the D.G. Set
- Check the voltage and frequency; it should be 430 V & 50 HZ.
- Change over the power supply from main power supply to D.G. Set for normal working.
- After attending the breakdown of power supply, restore the power supply and check the voltage and frequency of mains.
- Before change over the power supply from D.G. Set to main power supply inform to critical activities area personnel for normal working.