OBJECTIVE:
- To provide a procedure for transfer and receipt of finished goods from Production to Warehouse.
- To ensure that correct information of the product such as Product Name, Quantity, Batch Number, Manufacturing Date and Expiry Date is verified before transfer to Finished Goods Quarantine.
SCOPE:
The procedure shall be performed each time a product is being transferred from the Packing line to Finished Goods Warehouses.
RESPONSIBILITY:
- Packing line supervisor shall transfer the finished goods as per this SOP.
- Warehouse personnel shall receive the finished goods as per this SOP.
- The QA Manager, Plant Manager and Warehouse Manager shall ensure that the procedure is correctly performed.
PROCEDURE:
- Packing Supervisor should record the relevant information on the Finished Goods Transfer (FGT) note namely; Product Name, Batch Number, Description, Quantity and Manufacturing Date and Expiry Date, after verifying the same.
- The QC Executive shall physically verify the quantities and details on FGT note and sign for it.
- The Warehouse Personnel to physically verify the quantities on FGT and sign and transfer goods to finished goods quarantine.
PEOPLE ALSO READ: SOP for Issuing of Packaging Materials
- When satisfied by the product quality, QA will release the product to the market by attaching release labels on respective pallets containing the product.
- All released goods should be removed immediately from quarantine area to respective racks while waiting issuing to respective customer.
- Product must be issued according to FEFO system i.e. First Expiry, First Out.
ABBREVIATIONS:
SOP : Standard operating Procedure.
FGT : Finished Goods Transfer.
QA : Quality Assurance.
FEFO : First Expiry First Out.
PEOPLE ALSO READ: Dispensing of Raw Materials
1 Comments
good
ReplyDelete